Z structures

Z Vehicles

Accessories

 Z Scratch

Tools

 Customer Pics

 Links

 Contact

 

 

Additional Information:

1] Bridge can be set up to use catenary;

2] Most of the rods and shapes are already combined so that assembly is much faster than one might assume;

3] Bridge brass is a heavier gauge than usual;

4] Design follows actual bridge design practices so that the details are viable.

 

  1083 REDUCED PRICE 108.00  Bridge Features: Specifications 154' span, single track, cast & riveted iron fittings, rivet plates and pins. Plenty of height clearance for double stack container freight cars. 14 different rivers to chose from. Designed to fit two Marklin 8500 track sections. Designed per the "Easybrass" philosophy.Above Left: abutments by John Cubbin at Ztrains.com. Above Right: abutments & piers by Loren Snyder, avail. at Z Monster Trains.com

Unsupervised metalworking is not recommended for children under the age of 14 years.